Arab world’s first nuclear reactor cleared for start up

The United Arab Emirates took a final step toward switching on the Arab world’s first commercial nuclear power plant, even as the country prospers by producing and selling fossil fuels.

The U.A.E.’s regulatory watchdog gave long-awaited approval on Monday to the operator of the Barakah reactor, nudging the U.A.E. to the brink of membership in an elite club of 30 countries that make power from smashing atoms.

Built and run by a joint venture with Korea Electric Power Corp., the plant can now start loading fuel and ramp up to full commercial operation within several months. Other Arab countries, notably Saudi Arabia and Egypt, are also pushing into nuclear power in spite of questions about cost and safety.

Barakah is the first of four civilian reactors that the government plans to fire up by 2023. The plants, located on a sparsely populated strip of desert on the Persian Gulf coast, are estimated to cost $25 billion. The U.A.E. expects them to produce as much as 5.6 gigawatts once they’re fully commissioned, or almost a fifth of the country’s current installed generating capacity.

Arab nations have tried, and failed, in years past to build nuclear capabilities. Iraq under Saddam Hussein had a well-developed program until Israel, an unacknowledged nuclear state, stifled his ambitions by destroying the Osiris research reactor in an air raid in 1981. Non-Arab Iran has operated the Bushehr facility since 2011, but Tehran faces crippling U.S. sanctions over its atomic program.

Read more via Bloomberg

Discover more from The Dispatch

Subscribe now to keep reading and get access to the full archive.

Continue reading

Verified by MonsterInsights