A slow-moving wind turbine transport is on its way to the test centre in Oesterild from Hanstholm Harbour, West Coast of Jutland, Denmark, 25 November 2019.
The transport consists of two wind turbine sections, one 28-meter-high, the other about 8 m wide. The highway is closed to all public traffic and residents along the route were advised to leave their homes during the transport.
Photos: EPA-EFE/Henning Bagger
Click on photos to enlarge